Precise measurments were needed to fit this 60m tower amongst this array of Windmatic machines near Tehachapi, CA.
|
Mel Broyles (aka Dad) standing at the entrance to a tower that is located on one of Wyoming's premiere wind energy development areas.
|
Installing our first 80 meter tower, designed by AAT Solutions Inc., Gaspe, Quebec, Canada. KB was the first US certified installer of the 80 meter tower.
|
Quality workmanship and safety are key components of a successful met tower installation.
|
|
First Phased-Array Doppler Sodar (sonic detection and ranging) unit deployed by KB Energy Co, staying on the cutting edge of resource assessment.
|
Island of Grenada, February 2008 - Lael Hitz, KB Energy crew leader, installed (2) NRG 50m towers with help from these gentlemen with the local utility. This was KB Energy's first international work (aside from Canada).
|
|
|
|